No canal system has been constructed in this project. The speciality of this project is that the water impounded in the reservoir will be made available to the Kole land fields through the river and existing canal system by means of regulator at Manjankuzhi, Kottamkadalavu and Illickal. The Kole land in Thrissur is famous for its Unique system of cultivation. By this project it is proposed to raise two crops from the command of 13000 Ha (Net). It is also proposed to generate power of 2.5 mw. The water released from this project will be utilized for the drinking water supply system also. This project was fully commissioned and dedicated to the nation in 1996. |